AI Factories

AI factories, built where the power is.

Standardized AI factories from 200 kW to 150 MW, built and operated by Starfield on partner power, and joined into one network by Fabric.

Edge AI factory · from 200 kW

On-prem and at the edge

A standardized unit for a customer's premises, an industrial site or a regional edge location. Keeps data and inference in the building.

AI factory site · 1–150 MW

Grid-scale capacity

Standardized modules deployed at sites with energized power, sized to demand and added one unit at a time.

Design principles
A-01

Energy-first

Sited where power and connectivity already exist, not where a campus can one day be built.

A-02

Standard units

The same building blocks everywhere, so every site behaves the same inside Fabric.

A-03

Right-sized

Capacity added in steps as demand grows, instead of buying for a peak that may never come.

A-04

Operated by Starfield

We build and operate; partners bring power and sites. Operators, not developers.